EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
DaveBellairs
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (652)
Research
Workshop
- (4)
Empennage
- (14)
-
Empennage fairing...
-
Empennage fairing...
-
HS and Elevators...
-
Finished SB-00036
-
And more SB-00036
-
More SB-00036
-
SB-00036 HS doublers
-
SB-00036 HS elevator...
-
HS tips
-
HS tips edge glass...
-
Rudder bottom
-
Rudder tips
-
Bottom rudder fairing
-
Elevator control horn
Fuselage
- (54)
Firewall
- (78)
Tail Feathers
- (40)
Wings
- (105)
Controls
- (6)
Avionics
- (149)
Lighting
- (13)
Instrument Panel
- (9)
Landing Gear
- (4)
Engine
- (159)
Propeller
- (1)
Fuel System
- (7)
Interior Finish
- (3)
Paint / Decals
- (6)
Inspection
Tools
Builder Name:
Dave Bellairs
-
Project:
Vans - RV-7
-
VIEW REPORTS
Total Hours:
1460.9
Total Flight Time:
Start/Last Date:
Jun 24, 2017 - No Finish Date
Engine:
Lycoming IO-360
Propeller:
Whirlwind 200RV
Panel:
Advanced Flight Systems Avionics
Friendly URL:
https://eaabuilderslog.org?s=DaveBellairs
Home or Last Project Picture
Mar 21, 2023
SB-00036 HS elevator brackets
- (1 hour)
Category: Empennage
Spent some time studying the SB kit and whether I want to do the full SB or just the part for rear spar with no cracks. Think I'll start and see how hard it's gonna be to install the forward doubler.
0DEB76DC-0A6B-431C-AF21-D0E7603D67C0.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.